FFL and RL meaning construction

FFL = Finished Floor Levl RL = Ridge Level These are taken from a local TBM (Temporary Bench Mark) usually note as 100.00 on a site plan and are a fixed point. From your levels your ridge height will be 10.72m high, above finished floor level (FFL The heights where these 'levels' are located are referred to as the Reduced Level (or R.L for short) The R.L can be referenced in 2 ways. As an arbitary number, or, according to the Australian Height Datum (AHD) If you look at the site plan, on the bottom left of the corner of the site is the level 10.00 Finished floor level - Designing Buildings Wiki - Share your construction industry knowledge. Finished floor level (FFL) refers to the uppermost surface of a floor once construction has been completed but before any finishes have been applied. So, in concrete construction it may be the uppermost surface of a screeded finish, or in timber construction, FFL will denote the top level of.

FFL and RL meaning - boards

2.07 Finished floor levels. Finished floor levels (FFL) or reduced levels (RL) are defective where they do not comply. with specified planning and/or building permit requirements. In other cases, FFL or RL are defective where: a) they depart from the documented RL or FFL by more than 40 mm; or FCL/FFL - Opposing and yet related, these construction acronyms mean the finished ceiling level (FCL) or finished floor level (FFL) GPO - General power outlet, one of the most common floor plan acronyms. MSB - The master switchboard, of course. RL - Reduced level, one of the less contextual and easily understood acronym Posted December 21, 2012. Yes, that's right. FFL refers to finished floor level i.e. the level of timber flooring or carpet etc. Sometimes plans may refer to SFL or structural floor level which would be the level of a concrete slab for instance before floor finishings have been fitted. Link to comment Once you get above about a 1 in 25 year (from memory) rain event the stormwater pipes no longer can carry the water and the road is the drain carrying the water away. There's a minimum freeboard requirement between the FFL and what has been determined to be (again from memory) the 1 in 100 year flood event carried by the road See, RL is basically the elevation of a particular desired location above the any presumed datum. As far as TBM is concerned it is the Bench Mark whose elevation is unlikely to change and we can measure various aspects of our survey like chainage,..

What are R.L's (Reduced Levels) on a drawing, and how to ..

  1. Reduced level. Relative level in surveying refers to equating elevations of survey points with reference to a common assumed datum. It is a vertical distance between survey point and adopted datum plane. Thus it is considered as the base elevation which is used as reference to reckon heights or depths of other important places
  2. ssl, ffl, sflabbreviations Slideshare uses cookies to improve functionality and performance, and to provide you with relevant advertising. If you continue browsing the site, you agree to the use of cookies on this website
  3. Construction FFL abbreviation meaning defined here. What does FFL stand for in Construction? Get the top FFL abbreviation related to Construction
  4. Correct me if Iam wrong, FFL refers to the level at the top surface of floor finish. This is where all the building element finish levels are referenced from. SFL refers to the level at the top surface of the floor screeding or concrete topping. While SSL refers to the level at the top surface of the structural slab

Construction Drawing FFL abbreviation meaning defined here. What does FFL stand for in Construction Drawing? Get the top FFL abbreviation related to Construction Drawing RL stands for Reduce Level. It means you will be the owner of 1600 sq-ft property but you have to construct the house/flats within 1400 sq-ft. 200 sq-ft you have to leave for the road. What is the difference between RL and FFL? Hello and welcome to Just Answer Plan Symbols 2 A-4 Wall section No. 2 can be seen on drawing No. A-4. 3 L-5 Detail section No. 3 can be seen on drawing No. A-5. AA A-6 Building section A- The floor plans will also have the finished floor levels (FFL) on them so the builder knows how high above natural ground (NGL) the house is to be. The Elevations Example of a plan elevation. Just like the floor plan is an overhead view of the home, the elevation is a graphical representation looking at the home from the outside Floor plans, site plans, elevations and other architectural diagrams are generally pretty self explanatory - but the devil's often in the details. It's not always easy to make an educated guess about what a particular abbreviation or symbol might mean

Finished floor level, or FFL, is the height of the floor and flooring materials. Image Credit: Thinkstock Images/Comstock/Getty Images The impact of the finished floor level is that the difference between the structural floor level and the finished floor level may require the removal of a portion of the bottom of doors A datum is a point of referenced used within the construction phases for mapping and planning. Typically the datum's used within floor construction are referred to FFL and SSL. FFL (Finished Floor Level) is the very top of the floor once finish therefore, in residential developments this would be at the top of the tiles within the kitchen for. What does RL mean in Architecture? This page is about the meanings of the acronym/abbreviation/shorthand RL in the Academic & Science field in general and in the Architecture terminology in particular. Reference Level. Academic & Science » Architecture. Add to My List Edit this Entry Rate it: (1.00 / 3 votes Meanings of level in the construction industry. In relation to the built environment, the term ' level ' can have several different meanings. It can be used as another term for a building's storey or floor, i.e. ' level 3', or ' finished floor level '. It can be a term to refer to degrees of implementation of building information.

Finished floor level - Designing Buildings Wik

1 What is a RL in construction? 2 What is RL on a floor plan? 3 How do you calculate RL? 4 What is RL in surveying? 5 What do RL mean? 6 What is RL full form? 7 What is the difference between RL and FFL? 8 What is the highest RL that the FFL can be? 9 How do you take rl in a survey? 10 How do you calculate RL level? 11 How do you calculate RL. Freeboard is the term given for an allowance in floor levels above the modelled flood level, which allows for modelling inaccuracies, construction tolerances, network failures and natural environmental factors such as wave and wind effects. All local authorities have a freeboard level. This tends to vary from 300 millimetres to 500 millimetres The common abbreviation used in civil engineering are as following: A.A.S.H.T.O - American Association of state highway Transport Official. A.C.I - American Concrete Institute. A.R.E.A - American Railway Engineering Association. A.B - Anchor Bolt Or Asbestos Board. AC - Asphalt Concrete. A.S.C - Allowable Stress of concrete

The video is 90 seconds long and you will discover: The answer! Who uses AHD and why it's important. A common example of how it's used. We hope you find the information useful. Jurovich Surveying are expert surveyors involved in a range of surveying projects around Australia. If you need to talk to someone or get a quote, please contact us Re: FFL , FGL and FEL. 4. Wed Oct 05, 2016 5:59 am. The 41m/sec (146km/hour) is the estimated maximum (design) wind speed that the builder should be using when determining the various elements of the design. In other word things like . . .your roof fixings should keep your roof on if that wind speed occured Acronym: An abbreviation formed from the initial letters of other words and pronounced as a word. example CAD. Abbreviation: a shortened form of a word or phrase.Example: DIA for diameter. Using too many acronyms or abbreviations can make a drawing harder to understand. I recommend shorted words only if you can't fit the whole word on the drawing except construction details, which are required to be drawn to a minimum scale of 1:20 and site plans to a scale of 1:500. However, 1:200 is preferred by many Local Authorities. The scale may also depend on the area of the site. Figures 1 - 5 show a sample set of working drawings for the construction of a bric

Newbie FFL Finished Floor Level? - Real Estat

  1. Finished floor level (FFL) refers to the uppermost surface of a floor once construction has been completed but before any finishes have been applied. Floor levels and other vertical dimensions are usually expressed in meters to three decimal places, e.g FFL 16,550. Lintel Level of a Hous
  2. For veneer construction the extendable ties may be omitted. (d) For single leaf masonry walls stabilised by return walls, or engaged piers, any articulation joints must be within 300 mm of the vertical support (see Figures 3.3.1.3 and 3.3.1.4(b))
  3. Here is a quick guide to help you understand the survey plan for your new house. The plan below shows a survey plan for the block previously mentioned in the Title Plan Post. It doesn't include the easement to make it easier to see the other details. The bearing and length of each boundary are the same as the title plan in the format
  4. ABBREVIATION MEANING LIN Linen cupboard LINO Linoleum LVR Louvres M Meter MSB Master switch board O Oven PBD Plasterboard R / REFRIG Refrigerator RL Reduced level RS Roller shutter RWH Rainwater head RWP Rainwater pipe RWT Rainwater tank SC Stop cock SD Sewer drain SD Sliding door SHR Shower SS Stainless steel TC Terra cott

Top of foundation wall above finished ground level. 225 mm. Suspended timber floor construction - bottom of cladding. 200 mm. Suspended timber floor construction - underside of joists (i.e. crawlspace) 450 mm. Bottom of cladding to paving - except masonry veneer. 100 mm Thanks guys. The answers to your questions are: 1) The finished floor level (FFL) is marked on the plans as 35.35 above sea level. From the contour lines on the overall plot layout plan, the highest gradient intersecting with the unit should have been somewhere around 35.2. Therefore, as the FFL should have been at 35.35, at no point should it have been below ground level On 5 May 1971, Geoscience Australia, on behalf of the National Mapping Council of Australia, carried out a simultaneous adjustment of 97 230 kilometres of two-way levelling. Mean sea level for 1966-1968 was assigned a value of 0.000m on the Australian Height Datum (AHD) at 30 tide gauges [GIF 6.0 KB] around the coast of the Australian continent DR - drain. DWG - drawing. EA - exhaust air, each. EAT - entering temperature. EATR - Exhaust Air Transfer Ratio - to identify the amount of exhaust air transferred to inlet air in an energy recovery ventilator. E to C - end to center. EER - energy efficient ratio. EFF - efficiency. EJ - expansion joint Construction estimating terms are used in - surprise - the construction estimating phase. Construction estimating is a vital skill and practice in the industry, and can mean the difference between 'winning' and 'losing'. Construction estimating is a complicated process, and involves a lot of moving pieces as well as a lot of risk

Construction acronyms: The most important acronyms in

  1. When autocomplete results are available use up and down arrows to review and enter to select. Touch device users, explore by touch or with swipe gestures
  2. Here is the list of abbreviations used in civil engineering drawings that are commonly used. These abbreviations are very useful and important because, in general practice, these are used in all civil engineering related discussions
  3. Contour plans . Contour plans are a graphical representation of the lay of the land. They show the degree of slope on a site. They typically relate back to a site datum Datum is a given point that is easily found and recognised from which all other levels or heights can be transferred. referred to as a TBM (temporary benchmark) and may also relate to AHD (Australian height datum)
  4. I'm trying to get my head around floor levels. My site plan has FFL 100.41 and NGL 100.1. Are these values in millimetres? And there is a comment on the side of the plan saying.. Following step downs are taken from FFL of house slab Garage 135mm Porch 135mm. Does this mean porch and garage are below the natural ground level? Appreciate any help.
  5. Mean Sea Level 0.850m AHD; High tide 1.890m AHD (Mean High Water Springs) Low tide 0,23m AHD (Mean Low Water Springs) TBM - Temporary Bench Mark. There is an expense in transferring a level from a survey point to your block so your block can be surveyed with AHD levels and contours
  6. NOT FOR CONSTRUCTION A r chi teu al P oj s drawing plot date drawingrenvois.ion GD09 RL+ 74.05 RL + 73.70 FFL + 74.59 GW06 GW04 GW05GW07 GW08 FFL + 74.59 RL + 73,70 RL + 73,75 GW09 FFL + 74.59 RL + 74,3G50W 01GW02GD01 GW03 FFL + 74G.5W910 GW11 0 1 5 10m South Elevation East Elevation North Elevation West Elevatio

FFL - finished floor level? - General Discussions

  1. Plan 5: Section. A section is generally cut through a detailed section of the home and is shown as a very dark line with a letter on both ends. It describes how the building will be constructed and describes the internal finishes. Sections explain construction types in more detail. Interactive section plan Click to see interactive version of plan
  2. The list of abbreviations used in a set of structural drawings varies from office to office. Be sure to check the front section of the drawing set for the abbreviations used within. We also have an article that will help you identify structural drawing symbols. ASD. Allowable Stress Design
  3. A finish floor or floor covering is the ultimate top layer of all of the flooring layers. A finish floor or floor covering is the layer that you walk on and it is the decorative layer. Usually, floor covering is a more precise term, since the flooring tends to cover another, structural layer of flooring
  4. Piping Layout Drawings Abbreviations and Legends. Whenever you start reading a piping drawing or document, you can see many abbreviations on these drawings/documents. Many abbreviations are common and are regularly used in the drawings but few of the abbreviation are new and unique for a particular drawing. Sometimes it happens that there are.
  5. SFL, FFL, floors, walls and doors. September 18, 2014, 01:27 AM. We have a restaurant fitout in an existing space. I have modelled the existing conditions showing slabs at the Structural Floor Level. We are putting a timber floor over the top so I created a new Finished Floor Level at +30mm and placed my floors on that
  6. RL stands for Reduced Level (surveying, construction) Suggest new definition This definition appears very frequently and is found in the following Acronym Finder categories
  7. Department of Training and Workforce Developmen

View topic - What does Finished Floor Level (FFL) means in

Looking for online definition of FFL or what FFL stands for? FFL is listed in the World's largest and most authoritative dictionary database of abbreviations and acronyms The Free Dictionar Real Life (as opposed to the Internet) RL. Reinforcement Learning. RL. Responsabilidad Limitada (Guatemala) RL. Research Lab. RL. Reduced Level (surveying, construction

excluded from the definition of building work provided in the above mentioned legislation. Building standards are in the main described in the National Construction Code Series which includes the Building Code of Australia (BCA) (Volumes 1 and 2) and the Plumbing Code of Australia (Volume 3), which is adopted into law by regulation RL. Reduced level. It's a mark on your plans that references an offset from the project datum. Elevation, section, floor plan. Overall, this refers to different plans the architect has drawn. 'Elevation' refers to the view of your project from a particular side, whether north, east, south or west Floor finishing level is the final reduced level of the flooring level ( tiles/marble). Per say, the floor finish level is 50 mm (generally) above the concrete mother slab level. FFL- Finished floor level. SSL- Structural slab level A mixture of cement, lime, sand and water with or without chemical admixtures, used for the laying of masonry units and which binds them together after hardening. If the quantity of cement is great than the quantity of cement is greater than the quantity of lime, the mix is a cement mortar

In construction, a datum point is a known point of reference on the basis of which further measurements or analysis can be made. The point can be based on the finished floor level, an existing building or a benchmark. When based on a benchmark, a datum point refers to a position above sea level. Benchmarks form a network of reference points. Common Abbreviation Used in Civil Engineering. CIVIL ENGINEERING ABBREVIATION: The common abbreviation used in civil engineering are as follows: A.A.S.H.T.O - American Association of State Highway Transport A.B - Anchor Bolt Or Asbestos Board A.C.I - American concrete institute. A.R.E.A - American Railway Engineering Association. A.S.C - Allowable stress of concrete Familiarise yourself with symbols and patterns in your house plans. Basically, the lines represent the walls of the building and space in between the lines is the floor. The breaks in the walls indicate where the doors, windows, and room openings are. But, planning drawings are highly-detailed documents. It shows exactly what kind of wall.

Understanding what a fire resistance level (FRL) means is very important in ensuring compliance with the Building Code of Australia. Fire doors, or fire-rated doors, are one of the most important safety features of any building, but what exactly a fire door is can often be misunderstood.. In Australia, the National Construction Code dictates that all fire doors must be tested to certain. Contact Information. 3501 Jarvis Road Hillsboro, MO 63050. P: 888-737-7901 • F: 314-439-5328. Business Hours Monday - Friday: 7:30 AM - 4:30 PM CS What Does Zoned R1 Property Mean?. A property that is zoned R1 usually means that it resides in a neighborhood intended for single-family residences. It is the classic suburban neighborhood with. Hi, I am new to Revit and has 2013 student version. I am doing a simple enough house with an existing plan and a proposed plan. I have created phases by duplicating floor plan view and has existing GFL, RL and proposed GFL,FFL & RL. However I have just realised I dont have the same proposed levels..

What is the difference between RL (reduce level) and TBM

While our policy at Board & Vellum is to avoid using acronyms whenever we can, sometimes it's just unavoidable in architectural drawings. While contractors typically know what they all stand for, clients often do not. So, here is a handy (if limited) guide to some of the acronyms you'll see the most frequently Makes wide range of farming, construction equipment; with related financing: excavators, loaders (backhoe, wheel, skid steer), crawler dozers, motor graders.

Looking for the definition of FGL? Find out what is the full meaning of FGL on Abbreviations.com! 'Fox Glacier, New Zealand' is one option -- get in to view more @ The Web's largest and most authoritative acronyms and abbreviations resource Zoning activities are located in Comprehensive Planning's Current Planning Division.. Zoning includes reviewing Land Use applications and maintaining the Title 30 Development Code. Current Planning takes input from the Advanced Planning Division and the community to develop Land Use plans, which guide zoning decisions and the consistent processing of Land Use applications

Reduced level - Wikipedi

Development & Zoning Maps. FS21-512 & FS21-513 NEC of 163rd and Grand - Annexation and Rezone Request Development Project Neighborhood Meetin • Strong chassis construction provides excellent durability and stability, ensuring the operator can maneuver and quality components mean long term reliability and lower maintenance costs. Virtually maintenance-free Opt 3-Stg FFL Mast NL / RL ft/min (m/sec) 85 / 98 (.43 / .50) 39 Gradeabilit To read an architect's drawings, start by looking at the plan index, which should include a key for reading any abbreviations used as well as a scale bar so you know the size of the structures in the drawings. Then, use the info in the index to help you examine the floor plans and other drawings How to Use a Rotary Laser Level Like a Pro: Inside Edition. Using a rotary laser level inside is a bit less complicated than using one outside. Inside, our eyes can easily detect both traditional red lasers and newer, much brighter (and more expensive) green lasers. In fact, the DeWalt DW079LG delivers up to 250 feet of visible green lines inside

SSL, FFL, SFL Abbreviation

rl 98.055 cut 0.430 rl 96.420 cut 1.660 rl 94.716 cut 0.526 rl 96.594 cut 1.834 pad rl 94.417 pad rl 94.760 ffl 93.190 8:1 cut batter to rock, 1:2 cut batter to clay (1600mm min. offset from dwelling) ffl 94.560 ffl 94.800 ffl 95.000 ffl 94.760 max. 2000mm core-filled block retaining wall (min. 300 offset from boundary) max. 2200mm core-filled. FRL Explained. The technical expression of an FRL is: Structural adequacy is defined as the measure of a tested assembly to be load bearing, or carry a predetermined load, during fire conditions. This measure is generally relevant for wall systems and not door & frame systems. Door & frame systems are said to have no load bearing ability

FFL Construction Abbreviation Meaning - All Acronym

• Strong chassis construction provides excellent durability and stability, • Durable, quality components mean long term reliability and lower maintenance costs. Virtually maintenance-free Opt 3-Stg FFL Mast NL / RL ft/min (m/sec) 85 / 98 (.43 / .50) 3 gates of the same construction as the fence. H. For other facilities, other than a municipal solid waste site, a four-wire barbed wire fence, suitable to restrain livestock, shall be placed around the boundary of the permitted site. I. Provisions, approved by the County Commission, shall be made for the management of surface an rl 47,600 level 1: rl 50,400 level 2: rl 53,320 level 3: rl 56,240 plant deck: rl 58,940 ctl by nbn ld ntd by nbn er ld ntd by nbn roof: rl 61,100 nom ld ntd by nbn units x2 fire indicator panel units x2 units x2 o-ntd essential services by nbn o-ntd essential services by nbn fip lift to street pit maximum distance 50m without intermediate pit.

A type of alarm circuit which has four physical terminations in a common control's input, output, or DCL (SLC) circuits and which employs a single continuous two-wire loop (path) from the panel to the first device, on through to the last device, returning to the panel via a separate entry point in the enclosure The invert level is the elevation of the bottom inside of the pipe (for all intents and purposes, it can be the bottom of the pipe.) The invert has a reference level, typically the floor slab above. So if you know the slab elevation of your floor above and the ceiling height, you can determine the distance. The bottom of the pipe would be 2.5. The list of abbreviations used in a set of architectural drawings varies from office to office. Be sure to check the front section of the drawing set for the abbreviations used within rl 141.793 cut 0.218 rl 141.845 cut 0.270 rl 141.484 deb 0.086 rl 141 436 deb 0.172 pad rl 141.575 mj1051533 0 8 4 0 500 6 829 2 line of driveway profile location of outdoor clothesline (by owner) private steel pole located approx. 200mm from front boundary and 200mm from side boundary (by builder) garage ffl 141.815 proposed residence ffl 141.

Arhitectural drawing Levels: FFL vs SFL vs SSL Forum

Hence, a FRL requirement for a wall of 90/60/30 means that the wall must maintain structural adequacy for 90 minutes, integrity for 60 minutes and insulation for 30 minutes, as tested to AS 1530.4-1990: Methods for fire tests on building materials, components and structures - Fire-resistance tests of elements of building construction In your model/elevation view >> Place a spot elevation. Select it...and in properties palette >> Edit its type (Uncheck leader and change symbol to the one you modeled) Back on the properties palette place/type in a suffix RL. Will look like the image below. PS: there is a default filled triangle symbol; you just need to edit family and add a. context shall prohibit) shall have the following meanings: (a) Approved Builder shall mean and be defined as those builders of residential units approved by the ARB to construct residential improvements in Palm Lake pursuant to Section 4.7 of this Declaration Information Line: Call our Information Line at (360) 786-5490 ext. 2 to get automated information about zoning. Click here for instructions. (Hint: It's easier if you know your parcel number. If you do not know the tax parcel number, call the Thurston County Assessor's Office at (360) 786-5410 or look up the number on the Assessor's Parcel.

FFL Construction Drawing Abbreviation Meanin

Readers ask: What Does Rl Stand For In Construction

Engineers work internationally to design most of what is around us. Having precise vocabulary is key when working with large quantities of expensive materials or when aiming for exact specifications. When it comes to documentation and standardization, there is a specific set of engineering abbreviations that has made communication in the field of engineering uniform Elevations show height dimensions - in particular the Finished Floor Level (FFL) and Finished Ceiling Level (FCL). Note that the FFL shown in the sample elevation below is marked as 100.070. This means it is 70 mm (.070 m) above the surveyor's datum point, which is shown in the site plan above as 100.000 Lock/Unlock Elements. Display Order. Virtual Trace: Using References to Edit and Compare Model Views and Drawings. Choose a Trace Reference. Show/Hide Trace Reference. Move/Rotate/Reset Reference. Switch Reference with Active: Access Elements within the Reference for Editing or Copying

Floor plans - Leading Custom Home & Dual Occupancy

Find out what all those initials and acronyms really mean. Put Real Estate's Unfair Advantages to Work for Your Portfolio. Become a member of Real Estate Winners and learn how you can start earning institutional-quality returns with less than $1,000. Find out more by signing up below I spotted impacts for others at up to 1200 yards -- meaning that uber-high magnification isn't necessary for steel targets at 1000 yards. But if you're buying your first long distance scope, I think you'll find it nice to have 20x or 25x on the scope's high end -- not for all shooting and spotting, but here and there The People's Republic of China is the United States' second-largest trading partner and third-largest export market, yet U.S. exports to the country are among the most strictly controlled. Joseph D. Gustavus details the regime that governs trade between the two countries rl 36.013 cut 1.163 rl 34.451 fill 0.399 rl 34.916 cut 0.066 pad rl 34.850 pad rl 34.164 pad rl 33.594 5,100 4,500 6,300 2,346 1,593 7,727 4,780 11,105 9,939 falls trafficable 150mm grated drain and 450mm grated pit 24m² private open space @ max 10% gradient. compliant with 10.4.3 (a2) garage ffl 33.964 proposed residence ffl 34.534 proposed.

Floor plan abbreviations and symbols BUIL

The Tennessee Academic Standards provide a common set of expectations for what students will know and be able to do at the end of a grade for each subject area. Our state's standards are rooted in the knowledge and skills students need to succeed in their postsecondary studies and/or careers. The. Against the Grain. 116 likes. Fine woodworking from the Appalachian foothills with a focus on traditional hand tools, functional artistry, and revealing the unique character of the woo View the Christchurch District Plan for more information on Fixed Floor Level Overlay or contact a Duty Planner on 03 941 8999 or EPADutyPlanner@ccc.govt.nz. Christchurch City Council (Council) provides the information on this website on the following basis: The preparation and provision of this information have been made in good faith from a. print have a corresponding definition listed in Appendix 1. 1.5 Explanatory guidelines The Western Australian Planning Commission (WAPC) may prepare more detailed explanatory guidelines on the matters addressed in the R-Codes Volume 1, in consultation with local government and relevant stakeholders, to meet the objective

Report of Water Analysis 1910 W. McKinley, Suite 110, Fresno, CA 93728 FAX (559) 268-8174 - (800) 228-9896 - (559) 233-6129 Lab NoLab No. 178429 Sampler XXXXXX Vineyards Submitted Date 9/12/201 The site plan should feature a north point, a symbol indicating how the site that's depicted is oriented to true north in the site plan. The symbol will often come in the form of the letter N capitalized with an arrow attached, indicating which direction north is in the site plan About UPS; Media Relations Open the link in a new window; Investor Relations Open the link in a new window; Careers Open the link in a new window; Sustainability & Community Involvement Open the link in a new windo Welcome to RK Guns, the official online gun store of Rural King. Here you can buy guns online and have them shipped directly to the Rural King store of your choice and pay no FFL transfer fee! Normally, when you shop for guns online you have to pay a transfer fee to the receiving dealer. Shop for handguns, rifles, shotguns and pay a flat rate. 3.6m from ffl line of previously approved da line of previously approved da lift overrun 3.6m from ffl 1 bed 1 bed 1 bed carpark union street 1 bed 1 bed 1 bed communal space corlette street ground rl.4.30 first rl.7.30 second rl.10.30 podium rl.5.30 first rl.8.30 second rl.11.30 first rl.6.80 second rl.9.80 carpark bh bh bh void boundary. By definition, an LLC keeps your liability as a business owner limited so that your personal assets are protected. Let us help you through the process from start to finish. We Make It Simple. We'll check your LLC name, file your paperwork, and follow up with your state. All you need to do is tell us a little bit about your business